EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
CH750-SR
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (227)
Research
- (11)
Workshop
- (8)
Empennage
- (69)
Fuselage
- (20)
Firewall
Tail Feathers
- (8)
-
Elevator Trim Tab
-
Elevator and Engine...
-
Elevator Nose Skin /...
-
Elevator Trim Tab...
-
Trim Tab Channel
-
Trim Tab Channel Issue
-
Pick Up At Estes
-
Zenith Order
Wings
- (46)
Controls
Avionics
Lighting
- (1)
Instrument Panel
- (1)
Landing Gear
- (2)
Engine
- (58)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (3)
Builder Name:
Skip Rhudy
-
Project:
Zenair - CH 750
-
VIEW REPORTS
Total Hours:
551
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 17, 2019 - No Finish Date
Engine:
Corvair
Propeller:
Sensenich W642KL-35GS
Friendly URL:
https://eaabuilderslog.org?s=CH750-SR
Home or Last Project Picture
Jun 05, 2020
Elevator Nose Skin / Engine Components
- (2 hours)
Category: Tail Feathers
More drilling on elevator nose skins (dimple drill first, then remove and drill all the way for proper alignment). Fit perfect, drilled out to A4.
Corvair engine parts arrived from SPA.
IMG_20200602_234002.jpg
IMG_20200605_205758.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.